Arras Minerals Intercepts 365m @ 0.88 % CuEq, Including 64m @ 2.62 % CuEq at the Beskauga Project, Kazakhstan

Table 1.
Summary table for holes Bg21009, Bg21010 and Bg22012
Figure 1.
Location of the holes completed to date as part of Arras planned 30,000-metre drill program on the Beskauga Main deposit and… Read full article


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *